Project Owner: Hancock Prospecting
Project Value: n/a Project Status: In Progress |
Location: QLD, Australia
Listing Started: 11 Mar 2010
Listing Ends: 11 Mar 2011 |
|
Summary: Hancock Prospecting has two projects under development in the Galilee Basin near Alpha, in Central Queensland. Hancock's Alpha Coal and Kevin's Corner Projects are adjacent projects located in the basin's rich thermal coal deposit, which until now has remained largely unopened to this level of development. |
|
Project Owner: DENDROBIUM COAL PTY LTD
Project Value: not disclosed Project Status: Design underway |
Location: NSW, Australia
Listing Started: 2 Mar 2012
Listing Ends: 2 Mar 2014 |
|
Summary: BHP Billiton - Dendrobium Mine, Longwall Upgrade Project |
|
Project Owner: BHP Billiton and Mitsubishi Development Pty Ltd JV (50/50) managed by BMA
Project Value: Not Disclosed Project Status: Open |
Location: QLD, Australia
Listing Started: 14 Apr 2011
Listing Ends: 1 Dec 2015 |
|
Summary: BHP Billiton selected Bechtel to be the contractor for its Brisbane Hub, an integrated office for planning, executing and optimising multiple projects over an extended period |
|
Project Owner: BHP Billiton
Project Value: n/a Project Status: In Progress |
Location: SA, Australia
Listing Started: 10 May 2007
Listing Ends: 12 Feb 2014 |
|
Summary: The proposed expansion is centred on the creation of a new open-pit mine that would operate simultaneously with the existing underground mine. The proposed expansion would be a progressive development, requiring construction activity over several stages. ICNSA and BHP Billiton have set up a website where companies can register their interest in supplying to both the existing operation and the proposed expanded operation. |
|
Project Owner: CENTENNIAL COAL COMPANY LIMITED
Project Value: $200 million Project Status: Design underway |
Location: NSW, Australia
Listing Started: 14 Jul 2011
Listing Ends: 31 Dec 2012 |
|
Summary: A new longwall will be installed at the Springvale Colliery, near Lithgow, in the Western Coal fields of NSW. |
|
Project Owner: CENTENNIAL COAL COMPANY LIMITED
Project Value: $420 million Project Status: design & procurement underway |
Location: NSW, Australia
Listing Started: 18 Apr 2011
Listing Ends: 31 Dec 2015 |
|
Summary: The project is based upon the purchase of an underground mobile fleet, to be used for development & production operations, which includes gateroad & bord & pillar mining methods .
|
|
Project Owner: Australian Mining Services International Pty Limited
Project Value: $100m Project Status: Underway |
Location: China (Mainland)
Listing Started: 22 Dec 2010
Listing Ends: 22 Dec 2012 |
|
Summary: Phase two will build upon the success achieved with the 1st China Coal Industry Technologies Project. |
|
Project Owner: Waratah Coal
Project Value: $8.3 billion Project Status: Open |
Location: QLD, Australia
Listing Started: 18 Apr 2012
Listing Ends: 18 Apr 2013 |
|
Summary: The Galilee Coal Project (Northern Export Facility), also known as the China First Project, is an integrated project to develop a new coal mine, high capacity rail system and coal export facilities to export high volatile low sulphur steaming coal to international markets. |
|
Project Owner: Industry Capability Network (NSW) Ltd
Project Value: $500 million Project Status: Open |
Location: NSW, Australia
Listing Started: 1 Jul 2010
Listing Ends: 1 Dec 2012 |
|
Summary: Under the Commonwealth Government Supplier access to major projects (SAMP) program ICN NSW will lead trade missions to South America and Africa to introduce Australian mining equipment and service exporters to expand their global markets. |
|
Project Owner: Integral Coal Operations
Project Value: $250 million Project Status: Design underway |
Location: NSW, Australia
Listing Started: 4 Aug 2011
Listing Ends: 3 Aug 2013 |
|
Summary: New complete longwall system |
|
|
|
|
|
|
|